Free to post. Local vendors bid within days.
Two residential high-rise towers against a blue sky

As-Built Documentation · The Bronx

As-Built Documentation Services in the Bronx

Bronx apartment buildings from the 1920s and 1930s have been subdivided, combined, and renovated for generations, and most owners have no accurate plans of what they own. As-built documentation gives them one, drawn from a scan in AutoCAD or Revit. Post an as-built job on ScanBid NY and compare bids from vendors who document buildings in the Bronx.

Unit plans and building sets for pre-war buildings

A complete existing-conditions set for a six-story building includes every unit, the common areas, the cellar, and the roof, along with building sections and elevations. Owners use it for leasing, for DOB filings, for capital planning, and for energy and compliance work. Vendors typically scan the building and draft from the point cloud so the set reflects real conditions.

Facade elevations for Local Law 11

Measured elevations of each facade give the inspecting engineer an accurate base for the Local Law 11 report and a way to locate conditions precisely. When repairs are required, the contractor can take quantities from the same drawings. Elevations are drafted from a scan captured at street level and from the courtyard.

Industrial and commercial documentation

Warehouses and distribution buildings in Hunts Point and Port Morris are documented for fit-outs, conversions, and structural assessment. The set captures column grids, clear heights, dock and door positions, and existing systems. Site plans with loading areas can be included.

Homes and new construction

Owners of detached and attached homes in Riverdale, Morris Park, and Throgs Neck document them before additions and renovations. For new construction, documenting at rough-in gives the owner plans of where pipes and wires run before the walls close.

Who posts this kind of job

  • Owners of pre-war apartment buildings
  • Engineers preparing Local Law 11 reports
  • Industrial landlords and tenants planning fit-outs
  • Architects filing alterations and conversions
  • Builders recording rough-in before drywall

Typical turnaround

Fieldwork for a six-story Bronx building typically takes one to two days, and a full existing-conditions set typically follows in two to four weeks depending on detail.

How posting works here

Post the building type, the number of floors and units, the drawing format, and the purpose of the set. Vendors who work in the Bronx bid with their deliverables and schedule. Compare bids and award the job on the platform.